Yilmaz Ulusoy Holding Energy Projects

Technical and economical due diligence reports were prepared for hydropower projects with a total installed power of 22 MW.
 

Project Information

Client: Yilmaz Ulusoy Holding

Status: Completed 

 

 

Key Features

Installed Capacity 22 MW

Due Diligence

 

 

Summary

Prosem Engineering has provided consultancy services to Yılmaz Ulusoy Holding for purchasing energy companies. Within the context of consultancy, hydrological calculations of the projects has been restudied according the most up-to-date data and hydraulic results have been controlled.

In this respect, power potential and energy production capacity have been recalculated. Also, electromechanics and issues associated with system connections have been investigated. Moreover, the detailed cost analyses have been conducted for the projects and a risk assessment has been made. The project evaluation reports covering all studies conducted and field observations have been presented to the firm. Yılmaz Ulusoy Holding have made their decisions about the projects according to these due diligence reports.