Koprubasi Hydropower Project

The system having the storage capacity of 200.000 m3 behind the dam will fulfill the daily regulation with two equal capacity Francis type turbines.
 

Project Information

Client: Arsan Energy

Location: Gumushane

Status: Completed

 

 

Key Features

Concrete Gravity Dam

Installed Capacity 15 MW

Pondage

Stepped Spillway

 

Summary

Koprubasi Hydropower Project is a diversion type hydropower facility which makes use of the head between 1,245 m and 1,135 m of Siran Creek.

The project mainly consists of concrete gravity dam of height of 23 m, 3 km long reinforced concrete conduit with rectangular cross section, 1.625 m long concrete lined tunnel, a forebay, a 255 m long penstock and a powerhouse. The system having the storage capacity of 200.000 m3 behind the dam will fulfill the daily regulation with two equal capacity Francis type turbines.