Energy Potential Development in Albania

The three basins were analysed both in office studies and site investigations and according to these studies 13 hydropower project were developed in these basins.
 

Project Information

Client: Asja - Albania S.r.l - Tecsult Inc.

Location: Albania

Status: Completed

 

Key Features

Diversion Type

Installed Capacity 58 MW

Three Different Watershed

Project Development

Feasibility Studies

Concession Reports

 

Summary

Prosem Engineering gave consultancy services to Asia Albania S.r.l. for hydropower projects with a total installed capacity of 58 MW. Consultancy services were prepared in cooperation with Tecsult Inc.

The first stage of the studies is the project formulation development. The basins were analysed both in office studies and site investigations and according to these studies 13 hydropower project were developed in these three basins. Within the context of the consultancy services, project hydrology were studied, hydraulic calculations were executed, project costs, installed capacities and energy production values were calculated, risky points were determined, site investigations were made and the due diligence reports were prepared according to these studies. Furthermore, to calculate the hydrology of the projects more accurately, stream gauging stations were installed by Prosem Engineering.