Cokek Hydropower Project

The most critical point of the project is the fact that some parts of the project are located in an area that is announced as a disaster area by the Provincial Disaster and Emergency Directorate.
 

Project Information

Client: Batıçim Energy

Location: Muğla

Status: Completed

 

 

Key Features

Total Installed Capacity 11 MW

Project Hydrology

Hydraulic Calculations


 

 

Summary

Prosem Engineering gave consultancy services to Batıçim Energy for Çökek HEPP project. The project is located between 845 m and 360 m elevations of Tezli Creek.

In the original formulation, the project consisted of two parts as Çökek-1 and Çökek-2 Projects.  

Within the context of the consultancy services, the project hydrology was studied, hydraulic calculations were executed, project costs, installed capacities and energy production values were calculated and different alternatives were compared. The most critical point of the project is the fact that some parts of the project are located in an area that is announced as a disaster area by the Provincial Disaster and Emergency Directorate. Detailed site investigations are made in cooperation with academicians and experts and the due diligence reports presenting the possible risks and alternative solutions are prepared according to these studies.